page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82 page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
page 145
page 146
page 147
page 148
page 149
page 150
page 151
page 152
page 153
page 154
page 155
page 156
page 157
page 158
page 159
page 160
page 161
page 162
page 163
page 164
page 165
page 166
page 167
page 168
page 169
page 170
page 171
page 172
page 173
page 174
page 175
page 176
page 177
page 178
page 179
page 180
page 181
page 182
page 183
page 184
page 185
< prev - next > Energy Hydro power civil_works_guidelines_for_micro_hydro (Printable PDF)
80 CIVIL WORKS GUIDELINES FOR MICRO-HYDROPOWER IN NEPAL
Photo 5.9 A dry stone masonry forebay showing the connection
with the penstock
Chialsa mini-hydro scheme is based on such conventional
flushing system as can be seen in Photograph 5.6.
5.4 Forebay
5.4.1 GENERAL
The forebay of a micro-hydro scheme serves the following
functions:
It allows for the transition from open channel to pressure
flow conditions.
It regulates the flow into the penstock, particularly through
the release of excess water into a spillway.
It releases the surge pressure as the wave travels out of the
penstock pipe.
It can also serve as a secondary/final settling basin and
trap some particles that enter the headrace downstream of
the settling basin.
Although very rare in micro-hydro schemes, the forebay
can also provide water storage for use during peak power
demand period as discussed in Box 5.2.
Structurally, the forebay tank is similar to the settling basin
except that the outlet transition is replaced by a trashrack and
the entrance into the penstock pipe.
5.4.2 PIPE LEVEL
The forebay allows for the transition from open channel to
pipe flow by providing adequate submergence for the penstock
pipe. As discussed in Chapter 4, if the submergence head is
not sufficient, the pipe will draw in air and be unable to
convey the design flow. Similarly, recall from Chapter 4 that
the minimum submergence head required for the penstock
pipe is as follows: hs>1.5V2 / 2g where: hs is the submergence
head, and V is the velocity in the penstock.
5.4.3 DESIGN OF A FOREBAY
If the length of the headrace canal between the settling basin
and the forebay is long, then sediment can enter the canal,
such as when debris falls from uphill of the headrace alignment.
Similarly if an earth canal (or stone masonry in mud mortar)
is constructed between the settling basin and the forebay,
sometimes high velocity in the canal, such as during the
monsoon, can cause erosion and carry sediment to the forebay.
In such cases the forebay should also be designed to serve as
a secondary settling basin and the design method used for
sizing a settling basin should be used. However, a lower
sediment concentration (say C = 0.5 kg/m3) can be used since
only particles that have escaped the settling basin or those
that have been eroded from the headrace canal are expected
in the forebay. If the headrace upstream of the forebay consists
of HDPE pipe or of cement masonry canal and the settling
basin is functioning well, there will not be any need for
secondary settling. However, as a precaution, some storage
depth below the pipe invert should be allowed for. A depth of
300 mm or equal to the pipe diameter, whichever is larger is
recommended for this purpose.
5.4.4 FOREBAY SIZE
The minimum size of the forebay should be such that a person
can get in and clean it. The minimum clear width required
for this is 1 m. Even if the sediment load is not expected in
the forebay, it may sometimes reach this structure such as
when the settling basin is filled in quickly during the monsoon
or there is a small landslide. If a person can get into the
forebay and clean it occasionally or during the annual
maintenance period, limited sediment accumulation will not
be a problem. A storage depth below the invert of the penstock
should be provided for this, as can be seen in Figure 5.8.
If possible, the forebay should also be sized such that 15
seconds of the design flow can be safely stored in the tank
above the minimum pipe submergence level. This is more
important if the scheme consists of a headrace pipe instead
of a canal. There can be small transient surges in the headrace
pipe which result in uneven flow. The 15 second storage
capacity helps to balance such uneven flows.
5.4.5 TRASHRACK